Defects Were Recorded On Paper
Walkthrough notes and spreadsheets made it hard to keep a reliable, up-to-date list of open defects.
New properties rarely hand over defect-free, and recording issues on paper walkthroughs makes it hard to confirm every fix actually happened before handover. We designed and built a PropTech application MVP that records defects, assigns fixes to the right contractor, and tracks each one through to confirmed completion.
Recording defects on a paper walkthrough or spreadsheet makes it easy to lose track of which issues were actually fixed, which contractor was responsible, and which defects are still open weeks after the initial inspection.
The platform gives inspection teams one place to record every defect with photo evidence, assign it to the responsible contractor, and track progress through to a verified, confirmed completion.
Walkthrough notes and spreadsheets made it hard to keep a reliable, up-to-date list of open defects.
A contractor marking a defect fixed wasn't always confirmed against actual evidence before it was closed.
Developers had no easy way to see how many defects remained open across a property before handover.
A platform built around photo-backed defect recording, contractor assignment, and verified completion tracking.
Inspectors log each defect with photo evidence and location detail, capturing exactly what needs fixing.
Each defect is assigned to the responsible contractor, so accountability is clear from the moment it's logged.
Defects move through open, in-progress, and fixed status, giving everyone visibility into real progress.
A defect only closes once completion is verified against updated photo evidence, not just marked done.
Developers see the full count of open, in-progress, and closed defects for any property in one view.
Teams see at a glance whether a property has any unresolved defects before it's cleared for handover.
We reviewed how walkthroughs and defect recording currently worked to define what the platform needed to replace.
We defined how a defect needed to move from recorded to assigned to verified and closed.
Our engineers built defect recording, contractor assignment, and verified completion as one connected workflow.
We tested the platform against a real property inspection to confirm defects were tracked accurately end-to-end.
The MVP launched ready to manage live snag lists, with room to add more reporting detail next.
A defect marked fixed without evidence isn't fixed, it's just marked — verify the completion, and the snag list finally means something.
Every defect carries its own record with location, photo evidence, assigned contractor, and status attached directly to it.
Defects route to the responsible contractor automatically based on category, keeping accountability clear.
A defect's status only moves to closed once completion evidence has been reviewed and confirmed.
The MVP's data model supports adding new defect categories and property types in later product phases.
× Snag lists recorded on paper or spreadsheets
× Fixes marked done without verification
× No clear view of remaining open defects
× Contractor responsibility often unclear
✓ Every defect logged with photo evidence
✓ Fixes verified before a defect closes
✓ Clear property-level defect summary
✓ Contractor assignment tracked per defect
Log the defect once. Confirm the fix before it's closed.
A property handover only feels complete when every defect has actually been resolved, not just marked as such. By combining photo-backed recording with evidence-verified closure, the MVP gives developers a snag list they can trust.
"A snag list nobody verifies is just a wish list with extra steps. Photograph the defect, assign it, and confirm the fix before closing it, and zero defects becomes a fact instead of a claim.
"
If your team is managing snag lists informally, MVPHUB can help design and build the defect tracking MVP your development needs.