MVP DESIGN COMPLEXITY SCORE

Design Cut

Enter the screens, components, animations, and custom interactions planned for your MVP and get a design-complexity score plus which categories to cut first.

  • Uses your inputs in a transparent calculation
  • Instant result with practical next steps
  • No signup required

Planning guidance only. Validate important decisions with customer evidence and your delivery team.

How it works

1

Enter your planned design scope

Count the screens, unique custom components, custom animations/transitions, and custom (non-standard) interactions in your current design plan.

2

We compare each category to an MVP norm

Each count is measured against a reasonable MVP ceiling for that category, then averaged into a single complexity score out of 100.

3

Get the categories to cut first

Categories furthest over their norm are ranked first, so you cut the highest-effort, lowest-validation-value design work before development starts.

Frequently asked questions

Does Design Cut analyze my actual designs or Figma file?

No. Design Cut computes a complexity score entirely from the counts you enter — it does not connect to Figma, parse design files, or run any AI/LLM analysis. It is a scoping calculator, not a design auditor.

Where do the MVP norms come from?

The norms (roughly 12 screens, 15 custom components, 4 custom animations, 3 custom interactions) reflect typical scope for a validation-focused first release, not a hard limit. Treat them as a sanity check, not a rule.

What counts as a "custom" component or interaction?

Anything that isn't a standard pattern from your UI library or OS — a bespoke swipe gesture, a custom chart, a non-standard input control. Standard buttons, forms, and lists don't need to be counted.

My score is low — does that mean my product idea is bad?

No. A low score means the design scope is heavier than an MVP needs to validate the idea, not that the idea itself is flawed. Cutting scope now speeds up your first release without changing what you are trying to learn.

Should I cut the same categories every time?

No — re-run this after every design review. Scope typically creeps back into animations and custom interactions first since they are added incrementally and easy to miss in a screen count.

How We Compare

Feature MVPHub FigmaFigJam
Numeric design-complexity score from your own counts Included Not included Not included
Ranked list of categories to cut first Included Not included Not included
Actually design and prototype the screens Not included Included Limited
Team whiteboarding and scope brainstorming Not included Limited Included

Figma is where the screens actually get designed, and FigJam is where a team brainstorms and maps scope together. Design Cut runs earlier — a quick scope check before either of those tools to see if your design plan is already heavier than an MVP needs.

Embed this tool

Add this tool to your site with the canonical iframe below. It remains hosted and maintained by MVPHub.

<iframe src="https://mvphub.tech/tool/designcut/" title="MVPHub tool" width="100%" height="760" loading="lazy"></iframe>