MVP DECISION TOOL

Lead Time IQ

Measure supplier lead-time reliability using actual variance, promised-date accuracy, and exception visibility.

  • Uses your inputs in a transparent calculation
  • Instant result with practical next steps
  • No signup required

How it works

1

Assess Actual lead-time variance

Rate how well actual lead-time variance supports the decision. It contributes 40% of the result.

2

Check Promised-date accuracy

Score promised-date accuracy independently so a strong first factor does not hide a material gap. It contributes 35%.

3

Use Exception visibility to choose the next action

Rate exception visibility, then use the weighted result to decide what to validate or improve first. It contributes 25%.

Frequently asked questions

What does Lead Time IQ measure?

It combines ratings for actual lead-time variance, promised-date accuracy, and exception visibility into a focused planning signal.

Why is Actual lead-time variance weighted at 40%?

The weight reflects how directly this factor affects the decision. Every weight is shown so the result remains explainable.

How should I use a low Lead Time IQ score?

Improve the weakest input, collect the missing evidence, and reassess when the situation changes.

How We Compare

Feature MVPHub MiroNotion
Lead Time IQ weighted calculation Included Limited Limited
Input-specific next step for actual lead-time variance Included Limited Limited
Flexible collaboration workspace Limited Included Included

Lead Time IQ turns three focused inputs into a transparent weighted result. Miro and Notion are flexible workspaces for documenting the surrounding research, decisions, and follow-up work.

Embed this tool

Add this tool to your site with the canonical iframe below. It remains hosted and maintained by MVPHub.

<iframe src="https://mvphub.tech/tool/lead-time-iq/" title="MVPHub tool" width="100%" height="760" loading="lazy"></iframe>